Holy Cross College Early Learning Centre and Secondary School Building

CLIENT
Catholic Education Office WA

LOCATION
Ellenbrook

BUILDER
Absecon

CONSTRUCTION COMPLETE
June 2014

PHOTOGRAPHER
Acorn Photo


PROJECT DESCRIPTION

This project included an Early Childhood Centre of two Kindergarten GLAs, two Pre-primary GLAs, two Year 1 GLAs, a multi-purpose room along with the requisite toilets, storage and external grassed play area.

A secondary learning centre will be developed with Design & Technology on the lower level and GLAs on the upper level and will include additional staff work areas, storage and toilets.  This will provide the facilities required to meet the growing enrolment base in the Middle School in the 4 years after completion.

Some minor refurbishments are also included to accommodate the shortfall in specialist facilities. The redesign of the science laboratory will create a practice-based learning setting, and an existing Drawing Studio will be converted into a Dance Studio. Music practice rooms will be added to the current Music room.

Secondary School and Design & Technology building
Secondary Building- break out niche
Secondary Building- Science Refurbishment
Early Learning Centre exterior with coloured feature wall
Early Learning Centre- general learning area
Early Learning Centre with adaptable learning space and whiteboard wall
Early Learning Centre- open learning space
Early Learning Centre- break out nooks
Early Learning Centre- light well with playground roof in foreground
Secondary Building- Design and Technology workshop
Secondary and DT building- service entrance with extraction flues

NEXT
PREVIOUS