Hammond Park Catholic Primary School

CLIENT
Catholic Education Office WA

LOCATION
Hammond Park

BUILDER
Absecon (Stage 1)

CONSTRUCTION COMPLETE
Stage 1- Jul 2013

PHOTOGRAPHER
Silvertone Photography


PROJECT DESCRIPTION

The Hammond Park Catholic Primary School site is unique in its excellent quality natural woodland context. While natural vegetation and site gradients are often eliminated to ensure ease of construction and access, EIW Architects felt this site could provide an impetus for students and staff to engage in a meaningful and stimulating interaction with their natural surrounds. With this in mind we proposed encompassing natural spaces between buildings and maintaining and celebrating the natural landscape as a feature. The existing bushland becomes an exciting outdoor classroom of discovery and exploration, with pockets of vegetation kept throughout the site.

The proposed design enables adaptability and fluidity to reflect the learning styles demanded of a contemporary learning environment. Internal flexible spaces allow for a range of learning modalities by modifying the configuration of relevant, loose furniture to suit current tasks. Connection to external spaces (both visually and physically) on all buildings to both the north and south encourages accessible and supervised nature play learning. All circulation spaces have been incorporated internally as alternative places for learning that facilitate small group work and individual activity.

All buildings have been designed with natural passive solar design principles, and incorporate clerestory windows, carefully located thermal mass, large verandahs, cross ventilation opportunities, natural low-VOC materials and highly insulated walls.

 

School overview
Overview of focus and reflection points
Typical section of Early Learning Centre
Covered area
Cross feature at Entry
Seating in nature play area
Native gardens
A mixture of materials- timber and concrete
A mixture of textures
Covered Assembly area
Central stage space
Pre-Primary classroom ready for students
Administration reception

NEXT
PREVIOUS